Argonne Site Office CX Determinations
| Determination Date | Name of Action: Description | Categorical Exclusion Number |
|---|---|---|
| 5/16/2011 | ASO-CX-286 The Advanced Photon Source (APS) Upgrade Project | B3.6 |
| 5/18/2011 | ASO-CX-288 Building 203 Upgrade and Operation of the Detector Laboratory | B3.6 |
| 7/29/2011 | ASO-CX-290 Building 108 Boilers 1-5 NOx Emission Reduction Project | B2.5 |
| 5/17/2011 | ASO-CX-287 Energy Science Building | B3.6 |
| 3/17/2011 | ASO-CX-281 Biomass Production and Nitrogen Recovery in 21st Century Riparian Buffers | B3.8 |
| 3/21/2011 | ASO-CX-282 Building 211 Operation of the 20 MeV Electron Linac Accelerator and Upgrade to 50 MeV | B3.10 |
| 4/29/2011 | ASO-CX-283 Building 315 Experiments to Demonstrate Ex-Vessel Core Coolability under Early Cavity Flooding Conditions | B3.6 |
| 5/9/2011 | ASO-CX-284 Construction and Operation of the Advanced Protein Crystallization Facility | B3.6 |
| 3/3/2011 | ASO-CX-280 Refurbishing of the Quantum Design SQUID Magnetometer | B3.6 |
| 1/24/2011 | ASO-CX-277 Midwest Photovoltaics Analysis Facility at the Tollway | B3.6 |